
December 29, 2021
–
Al Borg, Egypt
600 TPD Soybean Plant | Egypt
Soybean cleaning, warm dehulling, expander section preparation with Kumar’s continuous solvent extraction plant with Crown DTDC for soy flakes
Capacity: 600 tonnes per day
Kumar’s continuous water degumming and drying unit for crude soybean oil
Capacity: 100 tonnes per day